-40%
110V 1200℃ Muffle Furnace Lab Resistance Melting Furnace Heater SX2-2.5-12A
$ 421.87
- Description
- Size Guide
Description
template1200℃ Muffle Furnace Lab Resistance Melting Furnace Heat Treatment 110V
Fast Shipping DHL OR EMS
New
Introduction:
Application
The products are widely applied in the chemical analysis and physical determination for labs in industrial and mining enterprises, scientific research institutes, etc; sintering stoneware, porcelain and ceramics; high-temperature heat treatment for metal annealing quenching and tempering.
Melting chamber use silicon carbide material.
Box type furnace
For laboratory, industrial and mining enterprises, scientific research units for heat treatment and determination of elements of small steel quenching, annealing and tempering heating for the high temperature box resistance furnace, the furnace can also be made of metal, ceramic sintering, dissolution and analysis in high temperature heating.
Characteristic
1. This series of resistance furnaces are rectangular in shape, and the shell is made of angle iron and high quality steel plate;
2. The workshop is made of refractory material. The heating element is placed in it. The furnace and the shell are insulated by heat insulation material;
3, multi door hinge is fixed on a furnace panel through the door closed, the door handle is the use of gravity through the lever principle will be closed the door and open the mouth, just put the hand lock up, glue to pull hook, the door on the left. In addition the lower door chain and safety switch, when the door open, electric power is automatically cut off, to ensure safe operation.
4 the temperature control system adopts microcomputer intelligent control, digital display temperature, equipped with large viewing angle ammeter, which can make the user clear observation.
Specification:
Model: SX2-2.5-12A
Voltage: AC 110V
Rated power: 2.5kw
Rated temperature: 1200℃
Melting chamber size: 20*12*8cm
Overall Dimension: 54 x 37 x 47cm
Gross Weight: 70kg
Model
Hearth size
Depth, width, height( mm)
Maximum temperature
(℃)
Power Supply
(KW/V)
Gross weight (KG)
SX2-2.5-10
200X120X80
1000
2.5/220 single phase
60
SX2-4-10
300X200X120
1000
4/220 single phase
80
SX2-8-10
400X250X160
1000
8/380 three-phase
150
SX2-12-10
500X300X200
1000
12/380 three-phase
200
SX2-15-10
600X400X300
1000
15/380 three-phase
320
SX2-2.5-12
200X120X80
1200
2.5/220 single phase
60
SX2-5-12
300X200X120
1200
5/220 single phase
80
SX2-10-12
400X250X160
1200
10/380 three-phase
150
SX2-12-12
500X300X200
1200
12/380 three-phase
200
SX2-15-12
600X400X300
1200
15/380 three-phase
320
SRJX-4-13
250X150X100
1300
4/220 single phase
80
SX2-6-13
250X150X100
1300
6/380 three-phase
100
SX2-10-13
400X200X160
1300
10/380 three-phase
160
SX2-12-13
500X200X180
1300
12/380 three-phase
250
SX2-15-13
500X300X200
1300
15/380 three-phase
300
SX2-8-16
300X150X120
1600
8/3-75 two-phase
290
SX2-12-16
400X200X160
1600
12/3-95 two-phase
360
1. Your valid phone number is very necessary for the shipping, otherwise we can't guarantee that the package would safely arrives.
2. Any Customs tax applied to this package should be covered by buyers.
3. As has been stated on the eBay item description, Import duties, taxes and charges are not included in the item price and shipping charges. These charges be at the buyer responsibility. meanwhile the customs tax depend on the buyer local customs office.
What in Package:
1 x SX2-2.5-12 Muffle Furnace
Contact Us:
1. We have always been trying to provide the best service and reliable products for every customer, however, accident may happen sometimes, please contact us to resolve any issue before leaving a negative feedback.
2. Please contact us by "Ask a question".
Payment
1. Payment methods accepted:
Paypal
only.
2. Payment must be received within 7 business days of auction closing.
Shipping
1. We ship your orders within 1-3 business days after the payment received.
2. Item shipped via Singapore Post or HongKong Post, It takes about 7-30 business days(USA,CA,AU,UK). Others country 10-20 business days(Brzil,India,RU), Exact delivery time depends on postal process.
3. If you do not receive your item(s) by 30 business days, Please feel free to contact us via ebay mail system, we will try our very best to resolve any problems with you.
Return Policy
1. Return is accepted within 30 days after the buyer's receiving the item.
2. If this item is defective upon receipt, customer has up to 14 days from date of receipt for exchange of a new one.
3. Unused/unopened merchandise will be fully credited.
Other Policies
We are not responsible for any custom duty or import tax.
If you need we write low price on shipping bill, pls leave message when you make payment.
All emails will be answered within 24 hours. If you do not receive our reply, please kindly re-sent your email and we will reply to you as soon as possible, Suggest send eBay message to us, That is easy to find.